top of page
Tangible Light
INTD 4081 Interiors Lighting Class
DAAP | Summer 2018
Programs: Hand Sketching, Material Studies, 3D Models, SketchUp, AutoCAD, Indesign, Fabrication Construction, Teamwork
Duration: 4 Weeks
Phases: Concept Design - Final Fabrication


Overall Project Description & Process
In a collaborative team of 11 students, we each had our main responsibilities (divided into the design team, construction team, and documentation team) and constructed the overall installation together. My contributions to the team included establishing the initial design principles (with the design and form later developed by other members), researching and selecting material for construction, and helping with pre-fabrication and construction the day of the installation. As a member of the documentation team, I was responsible for drawing and detailing all the construction documents, wrote content in the presentation, and produced the rendering of the overall installation.








CONSTRUCTION DOCUMENTS




Completed by teammate


Experience and Details

Overall Experience - Rendering

We somehow "pulled" this off
bottom of page